Machine Upgrades

RF01The upgrades and options offered by Maplan have the following advantages for you:

  • Extending life span of machine
  • Increasing processing range
  • Improving machine availability
  • Reducing capital expenditures as compared to new machine purchase

Contact:

Thomas Samel
Phone: +43 2252 790 909 177

Email: thomas.samel@maplan.at


 

  • Control system upgrade to PC 5000 touch

    Control system upgrade to PC 5000 touch

    Main components:

    • Exchange of electric cabinet
    • Order specific software package

    Lead time for offer:     ~ 3 Weeks
    Delivery time:     ~ 16 Weeks
    Cost of components:     ~ € 35.000,-
    Installation:    € 6.000 - 9.000

    Common options:

    • Injection graphics € 2.200.-
    • Logical Movement pneumatically € 750.-
    • Logical Movement hydraulically € 2.660.-
    • Cure² Interface € 2.600.-
    • Special program on request depending on complexity

  • Upgrade Shuttle Retrofit

    Upgrade Shuttle Retrofit

    Main components:

    • Base frame
    • Spindle gear motor including brake and safety clutch
    • Other mechanical components
    • Wiring and software

    Lead time for offer:     ~ 1 Week
    Delivery time:     ~ 16 Weeks
    Cost of components:     ~ € 30.000,-
    Assembly and commissioning:    ~ € 4.000,-


  • Upgrade Ejector Retrofit

    Upgrade Ejector Retrofit

    Main components:

    • Mechanics
    • Hydraulics
    • Wiring and software

    Lead time for offer:     1 -2 Weeks
    Delivery time:     10 - 14 Weeks
    Cost of components:      Order specific
    Assembly and commissioning:     ~ € 3.500


  • Option Brush System

    Option Brush System

    Main components:

    • Main console
      • Vertical or horizontal module  (for vertical or horizontal clamping unit)
      • Brush head
    • Electric or pneumatic drive option for brush head and axis movements are available

    Lead time for offer:     ~ 1 Week
    Delivery time:     10 - 12 Weeks
    Cost of components:          Order specific
    Assembly and commissioning :     ~ € 2.500,-


  • Option  Stuffer 15l

    Option Stuffer 15l

    Main components:

    • Stuffer
    • Connection parts stuffer -machine
    • Hydraulic components
    • Conversion kit for machine covers

    Lead time for offer:     ~ 3 Weeks
    Delivery time:     14 - 16 Weeks
    Cost of components:     ~ € 35.000,-